Donkey Kong 64 Guide: Explore Worlds, Unlock Characters, Collect Progress
Donkey Kong 64 is built around a simple loop: explore its worlds, collect progress items, and unlock more playable characters so you can tackle challenges you couldn’t reach before. The game spans eight themed areas, plus a dedicated training space and the DK Isles hub that ties everything together.
Worlds, Characters, and the Real Objective
You begin the adventure controlling Donkey Kong, but the roster grows over time until you can play as every available character—five in total. As you move through each world, you’ll find bananas and coins that help open up access to new areas and abilities.
However, the core completion goal is more specific. In each level, every ape character (and the supporting monkey characters) must gather five Golden Bananas, and the hub area also requires an additional set of five Golden Bananas for full progression.
Blueprint Banana (Golden Banana 5) Explained
While many bananas are tucked behind a variety of challenges, each level includes a special find: one banana obtained by trading a Blueprint with Snide. Those Blueprints are carried by enemies whose hair matches the color associated with that character’s smaller bananas and coins.
To make tracking consistent, this walkthrough treats the Blueprint Banana as “Golden Banana 5” for each Kong. Even if it rarely ends up being the fifth Golden Banana you personally collect, it gives you a reliable target. The guide also includes Blueprint checks so you can spot them early—then hold off on turning them in for bananas until you’re close to Snide, avoiding unnecessary trips.
Walkthrough Structure and Completion Rules
The guide is arranged by level and by character, with notes on whether certain tasks can be completed immediately or if you’ll need to return later. Expect to jump into and out of areas repeatedly, since new characters unlock new movement options and access.
Where You’ll Go
- Training
- Jungle Japes
- Angry Aztec
- Frantic Factory
- Gloomy Galleon
- Fungi Forest
- Crystal Caves
- Creepy Castle
- DK Isles – Central Hub
- Hideout Helm
Banana Completion: 75 Counts as 100%
Donkey Kong is an ape—and, per the guide’s tongue-in-cheek explanation, that means he’s “not very good at math.” The in-game tracker treats collecting 75 of the small, colorful bananas as sufficient for 100% completion of a level. This walkthrough will still point you to all 100 small bananas in each area, but in practice you only need 75 per Kong to meet the game’s completion requirement.
What’s Next in the Guide
Up Next: Training
Top Guide Sections
- General Tips
- Walkthrough
- Freeing the Kongs
- Boss Strategies


